INSTALLER GUIDE
10. BURNER INSTALLATION
10.1 Burner and supply pipe installation.
1. Refit the burner unit to the hotbox using the two screws removed previously.
2. Connect the supply line to the appliance.
3. If closed
open the isolating valve at the inlet 'T' connector.
,
4. Turn on the gas supply and pressure check the installation pipework for gas
soundness. In the United Kingdom check in accordance with the current edition of BS
6891. In the Republic of Ireland refer to the current edition of I.S. 813 "Domestic gas
installations".
10.2 Fitting the batteries.
1. Remove the receiver battery cover and fit the four 'AA' batteries as indicated inside
the receiver base. Replace the receiver battery cover. Place the receiver back into
place. The ultra-sonic sensor must face towards the front of the appliance.
2. Fit the PP3 battery to in the remote control handset. To do this slide the battery
cover back.
10.3 Preliminary burner checks.
Some burner operations can be checked at this stage. Checking now will mean that
less disassembly will be required if any problems are found. A full check should still
be made, however, after final installation.
10.4 Lighting the pilot.
Please note:- The fire must be lit manually.
1. Ensure that the pilot burner
control knob is in the OFF
position (1 in figure 17).
2. Depress the pilot burner
control knob and turn anti-
clockwise to the ignition
position (2 in figure 17) to
activate the piezo ignition
system. A 'click' will be heard
and the pilot should light. If
the pilot does not light
immediately, repeat the above
procedure, keeping the knob
depressed for several
seconds in order to purge any
air from the system.
If after ten seconds, ignition
Figure 17. Appliance manual controls.
has not occurred, turn the
©
Baxi Heating U.K. Limited 2010.
Page 25