Cabinet Internal Layout (02116411) Onsite Component Installation ECC800 Not required Power distribution Not required subrack Not required Electronic clasp Not required lock Lithium battery Required Integrated air Not required conditioner Water sensor Required Smoke detector Not required T/H sensor Required (10) PDU2000 Required...
Hardware Installation Installing the Cabinet 1. Determine the cabinet position based on the engineering layout diagram. 2. Place the cabinet at the correct installation position. 3. Level the cabinet using a wrench. Use a measuring tape to check that the vertical distance between the top of the 2000 mm high cabinet and the floor is 2000 mm (+3 mm).
Page 5
Installing Power Supply and Distribution Devices Installing a Lithium Battery 1. Push a lithium battery into the cabinet and secure it. For the 02116410 cabinet, install the lithium battery at the 2 U or higher position in the cabinet. For the 02116411 cabinet, install the ...
Page 6
For the 02116410 cabinet, one full-height vertical PDU2000 is installed in the left at the rear of the cabinet. For the 02116411 cabinet, two horizontal PDU2000s are installed. Intelligent PDU2000s and non-intelligent PDU2000s are supported. Non-intelligent PDU2000s are installed at the 11 U and 13 U positions at the rear of the cabinet.
Page 7
Installing a PAD 1. (Optional) Remove the baffle plate from the front door of the Converged Cabinet. 2. (Optional) Install the PAD support fastener on the back of the front door of the Converged Cabinet. 3. Adjust the PAD mounting support to match the dimensions of the PAD to be installed. 4.
Page 8
Installing T/H Sensors Installing Remote T/H Sensors for the Smart Cooling Product 1. Unpack the two T/H sensors, and attach one to the 33 U position on the right post of the front door and the other to the 10 U position on the right post of the rear door of the cabinet.
Page 9
(Optional) Installing a Server It is recommended that the server be installed at the 33–34 U position of the cabinet. You can adjust the position based on site requirements. 1. Determine the installation position of the server and check whether floating nuts are installed.
Page 10
(Optional) Installing a Camera 1. (Optional) Install an SD card. 2. Secure the camera to the mounting plate. (1) Cable outlet 3. Secure the mounting plate to the top 4. Adjust the camera. of the cabinet front door. 5. Install the transparent cover.
Page 11
(Optional) Installing a LAN Switch 1. Install guide rails and floating nuts. 2. Secure the LAN switch. 3. Connect the power cable of the LAN switch. 4. Connect any port from 1 to 24 on the LAN switch to the WAN1 port on the ECC800 using a network cable.
Page 12
c. Place the hard disks with ports facing upwards, align the screw holes on the hard disk tray with those on the hard disks, and fasten the screws. d. Insert the hard disk tray back at 45 degrees with the opening of its locking buckle facing downwards, hold the screw in the red-framed part to lower the hard disk tray until it is level, and fasten the screws on the left and right sides and the screw in the middle.
Page 13
2. Install the device. a. Install floating nuts on the guide rails and then install the guide rails. b. Install the floating nuts that secure the IVS1800. c. Install mounting ears. d. Install the IVS1800 in the cabinet. 3. Power on the device. (Optional) Installing a UIM20A Expansion Module 1.
(Optional) Installing a Fire Extinguishing Module 4.10 1. (Optional) Move the guide rails to the installation position of the fire extinguishing module. 2. Secure the fire extinguishing module. 3. Connect the communications cable of the fire extinguishing module to the AIDI_2 port on the ECC.
Page 15
Connecting Cabinet Input Power Cables Input Power Cables Input Power Cables to the PDU (02116410) to the PDU (02116411 & 02116412) Connecting PDU2000 Power Cables Full-height Vertical Power Cables to a Horizontal Non-intelligent PDU2000 (02116410) Non-intelligent PDU2000 (02116411 & 02116412) If the cabinet is equipped with an intelligent PDU2000, refer to the cable connections for a horizontal non-intelligent...
Page 16
(Optional) Connecting Connecting Cables PDU2000 Signal Cables Between Lithium Batteries and the UPS 1. Connect the LAN1 port on the ECC800 1. Connect cables between lithium to the PoE port on batteries and busbars. the UIM. 2. Connect the intelligent PDU2000 signal cables to the COM1/AIDI_4 and COM2/AIDI_5 ports...
Connecting Cables to the Management System Connecting IVS Cables 1. Connect one end of the ground cable to the ground terminal on the device and the other end to the ground point on the cabinet. 2. Connect one end of the network cable to any GE network port on the IVS. 3.
Page 18
□ Passed All cable joints are secured properly, especially the cable joints of network cables. □ Failed Exposed parts of cables and cable lugs near the cable terminals □ Passed □ Failed are wrapped with insulation tape or heat-shrink tubing. □...
PDB. than 12 hours. Otherwise, the compressor may be faulty, 2. Commission the system after and Huawei will not be liable for any loss caused thereby. 12 hours of preheating.
Page 20
Preparations and App Login 1. Download and install the FusionModule app from Huawei AppGallery. • If Huawei AppGallery has been installed on the PAD: Log in to the Huawei AppGallery client, search for FusionModule, and tap Install. • If Huawei AppGallery is not installed on the PAD: Method 1: Log in to Huawei AppGallery ( https://appgallery.huawei.com/), search for...
Page 21
2. Use the Service Expert app to authenticate the startup password. a) Download and install the Service Expert app from Huawei AppGallery. If Huawei AppGallery has been installed on the PAD, log in to the Huawei AppGallery • client, search for Service Expert, and tap Install.
Page 22
Commissioning an Electrode Water Sensor 1. Set water sensor parameters. Log in to the ECC800 WebUI as an administrator. Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed. Set Device type to ECC800 and Device name to ECC800, and click OK. On the query result tab page, set the new signal name of AI/DI_3 to Leak and click Submit.
Page 23
3. Check the T/H sensor functions. Check Method Normal Connection Status Check the running Choose Monitoring > Aisle > T/H Sensor Group > T/H Sensor information about the T/H > Running Info, and view the current cabinet temperature and sensor on the WebUI. humidity.
Page 24
7. Install the NE mediation. 8. Add a smart module. 9. Create an ECC800 on the NetEco. For details, see FusionModule500 Smart Mini Data Center V100R021C10 User Manual Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China...
Page 25
FusionModule500 Smart Mini Data Center Management System Wiring Diagram (02116410) LAN switch (24-port switch as an example) Door status RS485_IN sensor Smoke detector T/H sensor Server (2288X V5 as an example) 4G antenna COM1 /AIDI_4 ECC800 (front) WAN_1 AI/DI_1 AI/DI_2...
Page 26
FusionModule500 Smart Mini Data Center Management System Wiring Diagram (02116411, 02116412) IVS1800 Rack-mounted fire extinguisher RS485_IN RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN Server (2288X V5 as an example) T/H sensor Smoke detector LAN1/POE Cabinet electronic clasp lock COM3/12V 4G antenna COM1...