Power Supplies LEDs Buttons Connectors Power Supply Configuration Non-Redundant Mode N+1 Power Supply Configuration N+2 Power Supply Configuration Grid Configuration LEDs LED Locations Interpreting LEDs C H A P T E R 2 Installation Cisco UCS X9508 Server Chassis Installation Guide...
Page 3
Contents Installation Notes and Warnings for the Cisco UCS X9508 Server Chassis Rack Requirements Airflow Considerations Earth Ground Considerations Handling the Chassis Moving Server Chassis Installation Guidelines Required Equipment Unpacking and Inspecting the Chassis Rail Installation Templates Front Install Template...
Page 4
Installing and Removing the UCS X-Fabric Module Blank Installing an UCS X-Fabric Module Blank Removing an UCS X-Fabric Module Blank Recycling Printed Circuit Boards Recycling the UCS 9108 25G IFM PCBs Recycling the Chassis PCB Assembly (PCBA) Cisco UCS X9508 Server Chassis Installation Guide...
Page 5
Technical Specifications KVM Cable Chassis Specifications Environmental Specifications Environmental Conditions and Power Requirement Specifications for Twinax SFP+ Transceivers Specifications for the Cisco UCS X9508 Chassis Power Supply Units Supported AC Power Cords and Plugs Australia and New Zealand Continental Europe International...
Page 6
Contents Cisco UCS X9508 Server Chassis Installation Guide...
Page 7
Cisco has more than 200 offices worldwide. Addresses and phone numbers are listed on the Cisco website at www.cisco.com/go/offices. Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks, go to this URL: https://www.cisco.com/c/en/us/about/legal/trademarks.html.
Page 8
Cisco Bug Search Tool Cisco Bug Search Tool (BST) is a web-based tool that acts as a gateway to the Cisco bug tracking system that maintains a comprehensive list of defects and vulnerabilities in Cisco products and software. BST provides...
LEDs, on page 13 System Overview The Cisco UCS X9508 Server Chassis and its components are part of the Cisco Unified Computing System (UCS), which uses the Cisco UCS M6 compute node and its two Intelligent Fabric Modules (IFMs) along with the Cisco UCS Fabric Interconnects to provide advanced options and capabilities in server and data management.
Page 10
Overview System Overview Figure 1: Cisco UCS X9508 Server Chassis, Front System LEDs: Node Bays, a total of 8, which are shown • Locator LED/Button populated with UCS X210c M6 compute • System Status LED nodes. • Network Link LED...
Page 11
Overview System Overview Figure 2: Cisco UCS X9508 Server Chassis, Rear Power Entry Modules Intelligent Fabric Modules (PEMs) for facility inlet (shown populated), which power are always deployed as a pair of the following: Each PEM contains 3 IEC 320 C20 inlets.
This simplicity eliminates the need for dedicated chassis management and blade switches, reduces cabling, and enables the Cisco Unified Computing System to scale to 20 chassis without adding complexity. The Cisco UCS X9508 server chassis is a critical component in delivering the Cisco Unified Computing System benefits of data center simplicity and IT responsiveness.
Page 13
Tool-free installation Requires no specialized tools for chassis installation. Provides mounting rails for easy installation and servicing. Compute Node configurations Allows up to 8 full height UCS X210c M6 compute nodes. Cisco UCS X9508 Server Chassis Installation Guide...
The chassis is seven rack units (7 RU) high and can mount in an industry-standard 19-inch rack with square holes for use with cage nuts. The chassis can house up to eight full height Cisco UCS X210c M6 compute nodes.
Figure 3: Cisco UCS X210c M6 Compute Node Intelligent Fabric Modules The Cisco UCS X9508 contains Intelligent Fabric Modules (IFMs) on the rear of the server chassis. IFMs have multiple functions in the server chassis: • Data traffic: IFMs support network-level communication for traditional LAN and SAN traffic as well as aggregating and disaggregating traffic to and from individual compute nodes.
Cisco UCS X-Fabric Module Blanks The Cisco UCSX-9508-RBLK is Cisco UCS X-Fabric Module Blank slot which is used for providing future X-Fabric connectivity. Currently this module blank has active fans to facilitate airflow. In a typical configuration, this module blank can be installed in either of the two bottom slots in the rear of the chassis below the IFM slots.
• Grid configuration, which is also known as N+N power supply configuration, in which N is the amount of power supplies required to support the system power requirements. Note The chassis requires a minimum of two PSUs to operate. Figure 7: AC Power Supply Cisco UCS X9508 Server Chassis Installation Guide...
• When connecting the chassis to facility power, make sure not to overload the capacity of a PDU or power strip, for example, by connecting all PSUs to one PDU or power strip that is not capable of carrying the total power draw of the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
If one Active power supply should fail, the surviving supplies can provide power to the chassis, until the Standby power supply can be switched to Active status. In addition, Cisco Intersight turns on any "turned-off" power supplies to bring the system back to N+1 status. The system will continue to operate, giving you a chance to replace the failed power supply.
If one or two power supplies should fail, the surviving supplies can provide power to the chassis. In addition, the Cisco Intersight interface supports turning on any "turned-off" power supplies to bring the system back to N+2 status.
LEDs. LED Locations The UCS X9508 server chassis uses LEDs to indicate power, status, location/identification. Other LEDs on IFMs, PSUs, fans, and compute nodes indicate status information for those elements of the system. Figure 8: LEDs on a Cisco UCS X9508 Server Chassis Front View...
Overview Interpreting LEDs Figure 9: LEDs on the Cisco UCS X9508 Server Chassis Rear View Interpreting LEDs Table 2: Chassis, System Fans, and Power Supply LEDs Color Description Locator Locator not enabled. LED and button Blue Locates a selected chassis...
Page 23
No power to the chassis or the fan Fan Module module was removed from the (callout 3 on the Chassis Rear chassis. Panel) Amber Fan module restarting. Green Normal operation. Blinking amber The fan module has failed. Cisco UCS X9508 Server Chassis Installation Guide...
Page 24
Module Fans Link down. (callout 1 and 4 the Chassis Rear Green Link up and operationally enabled. Panel) Amber Link up and administratively disabled. Blinking amber POST error or other error condition. Cisco UCS X9508 Server Chassis Installation Guide...
Page 25
Drive Health installed, or it is not receiving power. Amber Fault detected Flashing Amber 4 Hz Rebuild drive active. If the Drive Activity LED is also flashing amber, a drive rebuild is in progress. Cisco UCS X9508 Server Chassis Installation Guide...
C H A P T E R Installation This chapter contains the following sections: • Installation Notes and Warnings for the Cisco UCS X9508 Server Chassis, on page 19 • Rail Installation Templates, on page 27 • Installing Cage Nuts, on page 29 •...
Do not use racks that have obstructions. These obstructions could impair access to field-replaceable units (FRUs). Cisco UCS is compliant with any EIA-310-D/E compliant rack. Your equipment racks must also be compliant with EIA-310-D/E standard. Also, be aware of these additional requirements: •...
Ground Lug Connecting the chassis to earth ground is completed by installing a grounding bracket, assembling the ground wire and ground lug, then screwing the ground lug and ground wire to the grounding bracket. Cisco UCS X9508 Server Chassis Installation Guide...
As a best practice, handle the chassis when it is empty, and use either a scissors jack or multiple people to bear the weight. The Cisco UCS X9508 has defined areas for holding the chassis (grasp points). Grasp points are not indicated on the chassis itself, but facilitate handling or moving the chassis.
Page 31
Installation Handling the Chassis Cisco UCS X9508 Server Chassis Installation Guide...
Page 32
Handling the Chassis • Rear grasp points Note Do not lift or handle the chassis by the top rear sheet metal, as indicated by the DO NOT LIFT label on the top rear surface. Cisco UCS X9508 Server Chassis Installation Guide...
Avoid UPS types that use ferroresonant technology. These UPS types can become unstable with systems such as the Cisco UCS, which can have substantial current draw fluctuations due to fluctuating data traffic patterns.
Compare the shipment to the equipment list provided by your customer service representative and verify that you have received the following items: • Any printed documentation • Accessory kit, which contains: • M6 cage nut (4) • M6 x 20mmL screw (16) • Power Cable Management Arm (2), UCSX-9508-PCMA Cisco UCS X9508 Server Chassis Installation Guide...
This template shows the rack locations for mounting the front of the chassis. Align the Chassis Top of the template with the location in the rack where the top of the chassis will be and install the cage nuts and other hardware as shown. Cisco UCS X9508 Server Chassis Installation Guide...
This template shows the rack locations for mounting the rear of the chassis. Align the Chassis Top of the template with the location in the rack where the top of the chassis will be and install the cage nuts and other hardware as shown. Cisco UCS X9508 Server Chassis Installation Guide...
To use the rack installation templates, go to the appropriate topic: • Front Install Template, on page 27 • Rear Install Template, on page 28 Cisco UCS X9508 Server Chassis Installation Guide...
Verify that the cage nut is fully and correctly installed before installing the remaining cage nuts. Rail Kits The Cisco UCS X9508 supports two rail kits, Type 1 and Type 2. Each rail kit consists of two stationary rails that facilitate rack installation of the chassis and stabilize the chassis in the rack.
Page 39
Both sides must be installed in the rack to securely support the chassis. If you ordered multiple UCS X9508 chassis, you might receive both types of rail kit. For example, in a shipment of 4 chassis, the shipment might have all one type of rail kit, or a few chassis with each type of rail kit.
Note To complete the installation, the chassis must be connected to earth ground, which requires a ground lug that Cisco provides, or an equivalent. See "Ground Lug" in Earth Ground Considerations, on page Cisco UCS X9508 Server Chassis Installation Guide...
(Optional) Use a tape measure and level to verify that the rack rails are horizontal and at the same height. Step 6 At the front of the rack, refer to the template, then insert a screw in each front rail to secure each rail to the rack at the correct location. Cisco UCS X9508 Server Chassis Installation Guide...
Page 42
Figure 15: Secure the Rail at the Front to the Rack Step 7 At the rear of the rack, refer to the template, then insert a screw in each rear rail to secure each rail to the rack at the correct location. Cisco UCS X9508 Server Chassis Installation Guide...
Before installing the chassis in the rack, compare the rail installation in the rack against the following layout images. If the rail installation is different than what is shown in each layout, remove the rails and reinstall them. Cisco UCS X9508 Server Chassis Installation Guide...
Page 44
Installation Rail Installation Layout Figure 17: Front Rail Layout, Both Rail Kits Cisco UCS X9508 Server Chassis Installation Guide...
PSUs, so the installation procedure is slightly different. See Installing the Ground Bracket and Bottom Cable Management Arms, on page Use this task to attach the cable management assemblies to the chassis before installing the chassis in the rack. Cisco UCS X9508 Server Chassis Installation Guide...
Page 46
Adjust the cable tie horizontally to align with where you wish to grasp the power cable. Step 4 You can use the cable ties to gather the power cables and secure the plugs in place. Cisco UCS X9508 Server Chassis Installation Guide...
The earth ground symbol on the side of the chassis indicates the correct location for attaching the ground bracket. b) Align the captive screws in the cable management sheetmetal with the threaded standoffs on the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
Also, make sure to review Installation Notes and Warnings for the Cisco UCS X9508 Server Chassis, on page The chassis must be grounded by a ground lug that Cisco provides, or an equivalent. See "Ground Lug" in Earth Ground Considerations, on page...
Page 49
Removing the side trim panels exposes the screw holes in each of the front mounting brackets. Keep the side trim panels in a safe location nearby. You will replace them when the chassis is installed. Note Cisco UCS X9508 Server Chassis Installation Guide...
Page 50
Figure 22: Detach the Chassis Side Trim Panels Step 4 At the front of the chassis, use a #3 Phillips-head screwdriver to insert and tighten the eight M6 x 20mm screws through the front mounting flanges. Cisco UCS X9508 Server Chassis Installation Guide...
If you will be installing the chassis in a stationary rack, continue the installation procedure. See Completing Installation, on page Installing Rear Mounting Brackets Use this procedure to install the rear mounting (tie down) brackets. Cisco UCS X9508 Server Chassis Installation Guide...
Page 52
Holding the rear mounting brackets in place, use the #3 Phillips-head screwdriver to insert the 8 M6 x 20mm screws through the rear mounting brackets, then tighten the screws to secure the rear of the chassis to the rear of the rack. Cisco UCS X9508 Server Chassis Installation Guide...
Figure 25: Securing the Rear of the Chassis to the Rack What to do next Complete installing the chassis into the rack. Go to Completing Installation, on page Completing Installation Continue with installing the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
For more information, see Connecting Rear-Mount Earth Ground, on page The facility ground cable must be terminated with the groung lug provided by Cisco, or an equivalent. For more information, see "Ground Lug" in Earth Ground Considerations, on page...
Page 55
When the chassis is fully installed, the side-mount earth ground point should be in front of the rear mounting brackets. As a result, you should have enough space to attach the ground cable. Cisco UCS X9508 Server Chassis Installation Guide...
Connecting the chassis to facility earth ground is supported through the chassis ground bracket, which installed at the side of the bottom set of PSUs. The facility ground cable must be terminated with the ground lug provided by Cisco, or an equivalent. For more information, see "Ground Lug" in Earth Ground Considerations, on page Use this procedure to connect the chassis to earth ground.
Page 57
Align the terminal holes in the ground lug with the terminal holes in the ground bracket. c) Using a #2 Phillips screwdriver, insert and tighten two M5 x 10mm pan-head screws to secure the grounding cable to the ground bracket. Cisco UCS X9508 Server Chassis Installation Guide...
IFM cables. There are no specific cable management trays for the top and bottom of the chassis. You can use one tray for each IFM installed in the Cisco UCS X9508 server chassis but Cisco recommends that you use one tray for all IFM cables.
Holding the cable management tray level, insert the hooks into the notches. c) When the cable management tray is flush against the chassis, push down to seat the hook into the notch. Cisco UCS X9508 Server Chassis Installation Guide...
Page 60
Installation Installing the Cable Management Tray Step 3 Repeat this procedure as needed to install the other cable management trays, if needed. Cisco UCS X9508 Server Chassis Installation Guide...
Detach the cable management tray from the chassis. a) At each corner of the cable management tray, apply equal pressure to slide the tray upward in the chassis notch until it can no longer slide up. Cisco UCS X9508 Server Chassis Installation Guide...
Page 62
Installation Removing the Cable Management Tray b) Holding the cable management tray level, pull it towards you to detach the tray from the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
If needed, you can order spare packaging from Cisco by using PID UCSX-9508-PKG=. If you are returning the chassis to Cisco, contact your Cisco customer service representative to arrange for return shipment to Cisco.
Page 64
Installation Repacking the Chassis Cisco UCS X9508 Server Chassis Installation Guide...
• Recycling Printed Circuit Boards, on page 93 Components The following figure shows an empty Cisco UCS X9508 server chassis and identifies the front, back, and module slots. Note Before you remove or install components, please ensure that all software applications are shutdown and management software is in a good state.
Page 66
Installing and Removing Components Components Figure 26: View of Cisco UCS X9508 Server Chassis, Right Side The side of the chassis has no handles because the chassis is heavy, and not intended to be lifted unless you are using a scissor lift or another type of mechanical lift device to bear the weight of the chassis. The right side of the chassis has the PSU Keying Bracket which enforces proper PSU orientation as well as proper PSU type.
Page 67
The front of the chassis accepts up to 8 Cisco UCS X210c M6 compute nodes with connections for power and basic signaling through the per-slot socket connections to the midplane. The front of the server chassis also hosts up to 6 PSUs providing power to the chassis power plane through internal connectors.
Page 68
Installing and Removing Components Components Figure 29: View of the UCS X9508 Server Chassis, Rear View Power Entry Modules (2) IFM slots (2) Each PEM houses three IEC 320 compatible C20 power inlets inlet facility power. Fan Bays (4) Expansion Slots (2)
Only trained and qualified personnel must be allowed to install, replace, or service this equipment. Statement 1030 Cisco UCS 9108 25G IFM Components The Cisco UCS 9108 25G Intelligent Fabric Module has the following board-level components. Cisco UCS X9508 Server Chassis Installation Guide...
Page 70
Port number 5 is the left port in this group, and port number 4 is the right port group, and port number 8 is the right in the group. port in the group. IFM ejector handles, left and right Cisco UCS X9508 Server Chassis Installation Guide...
Installing and Removing a Compute Node Blank The UCS X9508 supports up to 8 compute nodes, with a minimum configuration of one compute node. If compute node slots do not contain a compute node, you must install a compute node blank.
Pull the compute node blank towards you until it is completely removed from the chassis. Notice that the module blank has indicators that show how to orient the blank. You will use this information when you install a blank. Cisco UCS X9508 Server Chassis Installation Guide...
The module blank has an arrow and the word UP that show how to orient the blank. Also, if you attempt to Note install the blank with the wrong orientation, the module does not sit flush with the front of the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
Page 74
Installing and Removing Components Installing a Compute Node Blank Step 3 Keeping the compute node blank vertical, slide it into the slot until the blank is flush with the face of the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
Installing and Removing a Compute Node Figure 34: Installing a Compute Node Blank Installing and Removing a Compute Node The Cisco UCS X9508 server chassis supports full-height compute nodes. For details, see the Installation and Service Note for your compute nodes. See http://www.cisco.com/en/US/products/ps10280/prod_installation_ guides_list.html...
Push the ejectors until they are parallel with the face of the compute node. When the compute node is completely installed, the retention latches at the end of each handle click into place. Removing a Compute Node Use this task to remove a compute node. Cisco UCS X9508 Server Chassis Installation Guide...
Page 77
Place your other hand underneath the compute node to support it and slide the compute node completely out of the chassis. What to do next Fill the empty compute node slot. Go to the appropriate option: • Installing a Compute Node, on page 67 • Installing a Compute Node Blank, on page 65 Cisco UCS X9508 Server Chassis Installation Guide...
Installing a Power Supply The Cisco UCS X9508 AC PSU does not have a discrete power switch. It powers on immediately when it is successfully connected to the power midplane. PSUs can be installed in any order, and if you are installing a removed PSU, the PSU does not need to be installed in the same PSU bay that it originally occupied.
Page 79
For each PSU that must be installed, repeat these steps. Step 5 Verify the power supplies are operating by checking the power supply LEDs. See LED Locations, on page 13 Interpreting LEDs, on page Cisco UCS X9508 Server Chassis Installation Guide...
Removing a Power Supply Caution If you are using the Cisco UCS X9508 server chassis with one power supply, which is a non-redundant power configuration. Removing the power supply will cause the compute nodes and chassis to shut down. If you are...
Removing a PSU Blank Use this procedure to remove a PSU blank. Note The PSU blank is a small plastic piece. It does not have a locking latch, so it slides out easily. Cisco UCS X9508 Server Chassis Installation Guide...
Page 82
Using your thumb, grasp the PSU blank by the vertical fingerhold and pull the PSU blank straight towards you. The PSU should easily slide out of the chassis. Figure 38: Removing a PSU Blank Cisco UCS X9508 Server Chassis Installation Guide...
Installing a PSU Blank, on page Installing a PSU Blank The minimum supported power configuration for the UCS X9508 server chassis is three PSUs. If you will be operating the server chassis with an empty PSU bay, it must be covered with a PSU blank (UCSX-9508-PSUBK).
Make sure to follow all safety requirements while uninstalling the chassis, including using a device, such as a mechanical lift, to bear the weight of the chassis. Step 2 With the chassis in an ESD-safe work area, locate the PSU Keying bracket on the right exterior side of the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
Step 5 Keep the screws and bracket. What to do next Installing the PSU Keying Bracket, on page Installing the PSU Keying Bracket Use this task to install a PSU Keying bracket (UCSX-9508-KEY-AC=). Cisco UCS X9508 Server Chassis Installation Guide...
Page 86
Step 5 Reinstall the chassis: a) Insert the chassis into the rack. b) Reinstall the chassis components and reconnect any cables that were disconnected. For additional info, see Installing the Chassis, on page Cisco UCS X9508 Server Chassis Installation Guide...
Replacing the Power Entry Modules (PEMs) The Cisco UCS X9508 chassis contains two power entry modules (PEMs). Each PEM is a grouping of 3 IEC 320 compatible C20 power inlets. One PEM supports PSUs 1 through 3, and one PEM supports PSUs 4 through 6.
Page 88
Using a T10 screwdriver, tighten the captive screws which are easily identifiable because they are next to the electrical ground icons on the chassis walls. a) Tighten the exterior captive screws. b) Tighten the interior captive screws. Cisco UCS X9508 Server Chassis Installation Guide...
PEM screw for the replaced PEM, not both screws as shown in the illustrations. Before you begin The power entry modules (PEMs) are connected to facility power, so you must disconnect facility power from the PEM that you will be removing. Cisco UCS X9508 Server Chassis Installation Guide...
Page 90
Using a T10 screwdriver, loosen the captive screws that attach the PEM to the chassis. The captive screws are easily identifiable because they are next to the electrical ground icons on the chassis walls. a) Loosen the exterior captive screws. b) Loosen the interior captive screws. Cisco UCS X9508 Server Chassis Installation Guide...
Page 91
When you remove a PEM, you must replace it with another one. Do not operate the system with an empty PEM slot. What to do next Install a PEM. Go to Installing the Power Entry Modules, on page Cisco UCS X9508 Server Chassis Installation Guide...
When the fan module is almost completely installed, you might feel some resistance. The resistance is normal, and it occurs when the connector at the rear of the fan contacts the corresponding socket inside the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
Listen for the fan to power up and verify that the LED behavior is as expected. LED Locations, on page 13 Interpreting LEDs, on page Removing a Fan Module Step 1 Grasp the fan module handle and push down on the release button. Cisco UCS X9508 Server Chassis Installation Guide...
Page 94
Slide the fan module partially out of the chassis and place your hand underneath it to support it. When the fan disconnects from the midplane, it will power down. Step 3 Slide the fan completely out of the chassis, making sure to support its weight with your other hand. Cisco UCS X9508 Server Chassis Installation Guide...
In a typical configuration, there are three fans numbered from one to three. Use the following procedures to replace a fan on a Cisco UCS X9508 module or module blank. •...
Press down evenly on the fan until it is fully seated. Make sure the fan is level while you're installing it. You will feel the fan click into place when it is correctly seated on the module or module blank. Cisco UCS X9508 Server Chassis Installation Guide...
Pull the fan straight up. This step disconnects the fan from the power connector and lifts the fan off of the board. Figure 45: Removing the Fan from a UCS X9508 Module or Module Blank What to do next Insert a fan module. Go to...
Installing and Removing an Intelligent Fabric Module Intelligent Fabric Modules (IFMs) install in the rear of the chassis. They are always deployed in pairs, and the minimum IFM configuration for each UCS X9508 is two. For more information, see Intelligent Fabric...
Slide the module about halfway out of the chassis, then place your other hand underneath the IFM to support it. Step 5 Continue sliding the IFM out of the chassis until it is completely removed. Cisco UCS X9508 Server Chassis Installation Guide...
This resistance is normal. It occurs when the connectors at the rear of the blank contact the socket inside the chassis. Step 3 Grasp each of the module handles, and keeping them level, arc them inward toward the chassis. Cisco UCS X9508 Server Chassis Installation Guide...
Installing an UCS X-Fabric Module Blank, on page 92 Recycling Printed Circuit Boards The Cisco UCS X9508 and some of its modules have printed circuit boards (PCBs) that must be disposed of in compliance with your appropriate recycling and e-waste regulations, including, but not limited to Commission Regulation (EU) 2019/424.
Page 102
Grasp each fan module cable and remove it. b) Grasp each fan module and remove it. c) Grasp the M.2 storage module and remove it. d) Grasp the light pipe and remove it. Cisco UCS X9508 Server Chassis Installation Guide...
Page 103
Installing and Removing Components Recycling the UCS 9108 25G IFM PCBs Step 2 Remove the stiffener bracket. a) Using a T10 screwdriver, remove the M3 screws. b) Grasp the bracket and remove it. Cisco UCS X9508 Server Chassis Installation Guide...
Page 104
Using a T8 screwdriver, remove the M3 screws on the exterior of the IFM. b) Using a T10 screwdriver, remove the M3 screws on the interior of the IFM. c) Grasp the bracket and remove it. Cisco UCS X9508 Server Chassis Installation Guide...
Page 105
Using a T8 screwdriver, remove the M3 screw on the IFM faceplate. b) Grasp the plastic HDMI plug and remove it. c) Using an 8mm hexagonal nut driver, remove the standoffs. d) Using a T10 screwdriver, remove the M3 screws. Cisco UCS X9508 Server Chassis Installation Guide...
Page 106
Grasp the PCBA and disconnect it from the sheet metal. Step 5 Disconnect the remaining components from the PCBA. a) Using the T10 screwdriver, remove the M3 screws for the top heatsink. Cisco UCS X9508 Server Chassis Installation Guide...
Page 107
Recycling the UCS 9108 25G IFM PCBs b) Turn the PCBA over so that the bottom is facing up. c) Using the #1 Phillips screwdriver and remove the M2 screws. d) Using a pliers, release the four heatsink pushpins. Cisco UCS X9508 Server Chassis Installation Guide...
Page 108
Grasp the plastic bracket for the M.2 module and remove it. g) If the top heat sink is still attached, grasp and remove it. h) Grasp the three fan baffles and remove them. i) Grasp the center heatsink and remove it. Cisco UCS X9508 Server Chassis Installation Guide...
Recycling the Chassis PCB Assembly (PCBA) Each Cisco UCS X9508 chassis has a PCBA (motherboard) that is connected to the chassis midplane sheet metal. You must disconnect the PCBA from the chassis sheet metal to recycle the PCBA. Each PCBA is attached to the midplane sheet metal by 19 M4 screws.
Page 110
Step 2 On the left side of the chassis, use a T10 screwdriver to remove 14 M4 screws. Figure 49: Cisco UCS X9508 Chassis, Left Side Step 3 On the right side of the chassis, use a T10 screwdriver to remove 14 M4 screws plus the two captive M3 screws for the PEMs.
Page 111
Recycling the Chassis PCB Assembly (PCBA) Step 4 On the top of the chassis, use a T10 screwdriver to remove the eight M4 screws. Figure 51: Cisco UCS X9508 Chassis, Top Step 5 Remove the PEMs. a) On the interior of the chassis, use the T10 screwdriver to remove the two M3 captive screws for the PEMs, which are indicated by the ground symbol ( b) When the screws are removed, grasp each PEM and remove it from the chassis.
Page 112
Installing and Removing Components Recycling the Chassis PCB Assembly (PCBA) Step 6 Disconnect the rear bracket assembly: a) Grasp the two cables and unplug them. b) Using a T20 screwdriver, remove the four M4 screws. Cisco UCS X9508 Server Chassis Installation Guide...
Page 113
With the rear bracket assembly removed, disconnect the PCB: a) Grasp the cable and unplug it. b) Using the T15 screwdriver, remove the 19 M4 screws, and remove the PCB from the chassis midplane sheet metal. Cisco UCS X9508 Server Chassis Installation Guide...
Page 114
Installing and Removing Components Recycling the Chassis PCB Assembly (PCBA) Step 9 Recycle the sheet metal and motherboard in compliance with your local recycling and e-waste regulations. Cisco UCS X9508 Server Chassis Installation Guide...
A P P E N D I X Technical Specifications This appendix lists the technical specifications for the Cisco UCS X9508 server chassis and includes the following sections: • KVM Cable, on page 107 • Chassis Specifications, on page 108 •...
VGA (keyboard or mouse) monitor Chassis Specifications Figure 53: Chassis Dimensions Chassis Width: 17.5 in 444.5 mm) Total Chassis Length: 35.8 in (977.9 mm) Chassis Length sheetmetal only: 33.05 in (839.3 mm) Cisco UCS X9508 Server Chassis Installation Guide...
Page 117
Fully Populated UCS X9508 Chassis Approximately 400 lbs (181.43 kg) depending on models and options selected The system weight listed here is an estimate for a fully configured system and will vary depending on the devices installed. Cisco UCS X9508 Server Chassis Installation Guide...
Environmental Conditions and Power Requirement Specifications for Twinax SFP+ Transceivers Table 8: Environmental Conditions and Power Requirement for the SFP+ Transceiver Parameter Symbol Min. Max. Unit Storage temperature –40 °C Case temperature °C Module supply VCCT,R voltage Cisco UCS X9508 Server Chassis Installation Guide...
The jumper power cords, for use in racks, are available as an optional alternative to the standard power cords. The optional jumper power cords have an IEC C19 connector (such as a Cisco RP Series PEM) on the end Cisco UCS X9508 Server Chassis Installation Guide...
Only the regular power cords or jumper power cords provided with the chassis are supported. Australia and New Zealand Power Cord Part Number—CAB-AC-16A-AUS Cord Set Rating—16A, 250 VAC Figure 54: CAB-AC-16A-AUS Power Cord for the Cisco UCS X9508 Chassis Continental Europe Power Cord Part Number—CAB-AC-2800W-EU Cord Set Rating—16A, 250 VAC...
Technical Specifications Israel Figure 56: CAB-AC-2800W-INT Power Cord for the UCS X9508 Chassis Israel Power Cord Part Number—CAB-AC-2800W-ISRL Cord Set Rating—16A, 250 VAC Figure 57: CAB-AC-2800W-ISRL Power Cord for the UCS X9508 Chassis Japan and North America Non-Locking 200 to 240 VAC operation Power Cord Part Number—CAB-AC-2800W-US1...
Technical Specifications Peoples Republic of China Figure 58: CAB-AC-2800W-US1 Power Cord for the UCS X9508 Chassis Locking 200 to 240 VAC Operation Power Cord Part Number—CAB-AC-C6K-TWLK Cord Set Rating—16A, 250 VAC Figure 59: CAB-AC-C6K-TWLK Power Cord for the UCS X9508 Chassis Peoples Republic of China Power Cord Part Number—CAB-AC-16A-CH...
Technical Specifications Taiwan Figure 60: CAB-AC-16A-CH Power Cord for the Cisco UCSX X9508 Chassis Taiwan Power Cord—CAB-AC-C19-TW Plug—250 VAC 16 A, C19 Length—7.5 feet / 2.3 meters Switzerland Power Cord Part Number—CAB-ACS-16 Cord Set Rating—16A, 250 VAC Figure 61: CAB-ACS-16 Power Cord for the UCS X9508 Chassis...
A P P E N D I X Site Planning and Maintenance Records Note For information about how to query the chassis for configuration information, see the Cisco UCS Configuration Guide. This appendix includes the following records to use when installing the Cisco UCS server chassis: •...
Page 126
• Dedicated circuit for power supply • Dedicated (separate) circuits for redundant power supplies • UPS for power failures Grounding evaluation: • Circuit breaker size • CO ground (AC- powered systems) Cisco UCS X9508 Server Chassis Installation Guide...
Use the following worksheet to record contact and site information. Table 11: Contact and Site Information Contact person Contact phone Contact e-mail Building/site name Data center location Floor location Address (line 1) Address (line 2) Cisco UCS X9508 Server Chassis Installation Guide...
Compute Node 5 Compute Node 6 Compute Node 7 Compute Node 8 Intelligent Fabric Module-1 Intelligent Fabric Module-2 Note The serial numbers of all server chassis modules can be obtained using the Intersight management interface. Cisco UCS X9508 Server Chassis Installation Guide...
Site Planning and Maintenance Records FEX Port Connection Record FEX Port Connection Record Table 13: Chassis FEX to Fabric Interconnect Port Connection Record Connected to Number Port Fabric Slot Port Connection Interconnect notes A or B Cisco UCS X9508 Server Chassis Installation Guide...
Site Planning and Maintenance Records UCS 6548 Fabric Interconnect Port Connection Record UCS 6548 Fabric Interconnect Port Connection Record Table 14: Port Connection Record Fabric Interconnect Connected to Number Port Slot Port Connection notes Cisco UCS X9508 Server Chassis Installation Guide...