Procedure 1: Prepare to Install the Hub
Before installing the hub:
•
Complete site-required arrangements for the hub.
•
Make sure electrical power and temperature control requirements are met.
•
Define a strategy for integrating the hub into an existing loop.
•
Draw a map of all nodes to be connected to the hub.
Procedure 1: Prepare to Install the Hub
23